714000 sf | Everett, Washington | Critical Environments

Hermanson completed the design assist/pre-construction phase and prime mechanical installation on this project – one of the largest hospital expansion efforts in the region. The 11-story two tower hospital is comprised of two levels of support services, one level emergency services, one level of imaging/diagnostics, two levels of 22 surgery suites, one level back of house and six levels of 288 in-patient care rooms. Hermanson maximized off-site pre-fabrication opportunities to allow for minimal disruption. Of the 129,166 total labor hours put into this project, 39.1% of these hours were spent off-site for prefabrication which lead to improved quality control and on-site safety with fewer personnel.

Completed in 2012