VMWare POD 3 - Sabey Data Center

VMWare POD 3 - Sabey Data Center

Wenatchee, Washington
Hermanson completed Full Mechanical construction for this fast-tracked installation of a new data center in shelled out space. The total project area is approximately 21,000 SF and consists of 15,000 SF of “data hall” space for IT/Lab equipment, plus electrical rooms and a grey water equipment room. The scope of work includes the installation of new self-contained package units that will include outside air economizer capability and evaporative cooling, a new grey water system, construction of hot aisle containment, with new diesel powered standby generators with exhaust pipe risers on the exterior of the building and a new diesel fuel tank. The generator room requires additional fresh air intake louvers in the wall of an existing penthouse and additional radiator discharge louvers in the existing tilt-up concrete exterior walls.

In Progress