Army Growth Complex

Army Growth Complex

Joint Base Lewis-McChord, Washington
Hermanson was the Mechanical and Plumbing Design-Build contractor for this single project that included ten (10) separate buildings: Three (3) Four-Company Operation Facilities; One (1) Six-Company Operations Facility; Four (4) Battalion Headquarters; and One (1) Brigade Headquarters and Remote Switching Facility.  All were design and constructed within 540 days at several different locations on Fort Lewis Army Base. Hermanson self-performed HVAC and Plumbing, which consisted of hydronic heating, air conditioning, under-floor air distribution, BOC, NOC, and SCIF areas.

In Progress